Setting Out Works

Click images to enlarge

Stream Diversion - Leicestershire

Channel design, earthworks design, excavation quantification, operational scheduling, setting out and final QA certification for a 1.5 kilometers stream diversion, pond excavation and settling lagoon system.

Stream Diversion - Leicestershire

Landfill Void Setting Out Works - Brickworks Quarry,


North Staffordshire

Initial detailed site survey with excavated sidewall setting out and progress monitoring for the construction of a landfill cell within Etruria Marl deposit.

Landfill Void Setting Out Works

Restoration of Disused Colliery Spoil Heaps -


South Yorkshire

Surveying and setting-out of disused colliery tip earthworks, monitoring constructed and excavated slope gradients, roads, pavements, wetland areas and measurement of volumes.

Restoration of Disused Colliery Spoil Heaps

PEAK SURVEYING SERVICES Snitterton House, 3 Snitterton Rd, Matlock, Derbyshire DE4 3LZ Tel: 01629 581389 Fax: 01629 580007 design: Hammer Design